Accurate Lap Timing Surface Cutting
|
The track crew has marked the location for the wire loop and will begin cutting the surface. The line will be buried an inch below the asphalt surface. Dirt tracks will dig down 12-18 inches, and the wire will be contained in PVC pipe. View Related Article
|
|