Electronic Timing And Scoring System - Timing is Everything
The track crew has marked the location for the wire loop and will begincutting the surface. The line will be buried an inch below the asphaltsurface. Dirt tracks will dig down 12-18 inches, and the wire will becontained in PVC pipe.
View Related Article
|
|