|
Here, a plumb bob is dropped to the center of the front wedge bolt to accurately measure 12 inches forward along the top bay bar. This is the location where they decided to cut the bay bars. From this point, they will cut and notch 1 inch 0.095 tubing, placing it as the new down supports for the bay bar. View Related Article
|
|